Construction of building was stopped due to lock down then do we need to capitalise the borrowing cost incurred during that period or debit to p and l a/c?
bsai partish
CA Final
★ 2K+
25-May-21 18:05
671
Answers (2)
Stoppage due to lockdown is abnormal in nature consequently capitalization of borrowing cost should be suspended