Forums
Costing
Hi sir, For eg, if I am a manufacturer and a transport company gives a quotation like this- Agency Fees = Rs. 1000 Lorry Charges = Rs. 20/Km Driver Charges = Rs. 100/hr. My question is - 1. The above expense has multiple components, so will the transport cost be still considered a semi-variable cost? 2. And if it is, is it possible to deduce different components of cost if the problem gives overall cost at multiple points, for example, if the problem states the cost as- 200 kms. in 1 day = Rs. 7600 500 kms. in 2 days = Rs. 15800, is it possible for us to deduce and find out each component of cost?